Francesco Lelli

 

Francesco Lelli

Other Publications

Contact:


Skype Me™! Chat with me
More Information

Selected

For the complete list of pubblications please visit the Publication page

this is an old page, you may want to refer to this index for accessing the new version of the website. In particular the following:

Publications

Additional relevant links includes:

For the complete list of pubblications please visit the Publication page
Invited Speeches
  • GRID enabled remote instrumentation and sensors with distributed control, Workshop on Remote Sensing Applications Using Advanced Tools of High Speed Computing and Modeling. El Cairo, Egypt, 9th September 2007
  • The GridCC Project, Int.eu.grid Kick-Off Meeting 19th June 2006 Santander, Spain, 19th June 2006
  • The GridCC Project, TriGrid Workshop, National Institute of Nuclear Physics of Italy, (INFN), Catania, Italy 13th March 2006
Project Deliverables (Authors are in no particular order)
  • S. Gomez, S. Strauch, C. Momm, M. Jimenez, C. Sheridan, F. Lelli, F. Exertier, P. Arozarena, Integration of Results, 4CaaSt Project, Deliverable 1.3.1, October 2012
  • A. Spriestersbach, A. Giessmann, V. Anagnostopoulos, J. Caceres, M. Peñalvo, S. Strauch, T. Binz, D. Toth, D. Fey, J. Niemoeller, F. Lelli, J. L. Vazquez-Poletti, M. Jimenez, S. Carrié, F. Exertier Analysis of the state of the art and Definition of requirements, 4CaaSt Project, Deliverable 1.1.2, October 2012
  • F. Lelli, D. Nguyen, D. Mazmanov, J. Niemoeller, S. Carrie’ Component Design and Open Specification, 4CaaSt Project, Deliverable 2.2.2, July 2012.
  • F. Lelli, Y. Taher, D. Nguyen, Blueprinting the Cloud: Scientific and Technical Report , 4CaaSt Project, Deliverable 2.1.2, July 2012.
  • T Binz, J. Caceres, S. Carrie, F. Exertier, S. Garcia, M. Jimenez, R. Krebs, N. Kruber, F. Lelli, G. Le Jeune, J Lopez, J. Martínez, B. Moltchanov, J. Niemoeller, S. Ortega, C. Sheridan, A. Spriestersbach, Y. Taher, Conceptual Model and Reference Architecture 4CaaSt Project, Deliverable 1.2.2, August 2012.
  • P. Arozarena, S. García, V. Andrikopoulos, S. Strauch, F. Exertier, C, Momm, J. Vogel, J. Niemoeller, F. Lelli, S. Carrie, V. Moulos, B. Moltchanov, Use Case Applications eMarketPlace for SMEs: Report on Integration 4CaaSt Project, Deliverable 8.1.3, May 2012.
  • F.Lelli, M. van der PaauW, Experimental Prototype of Software Components and Documentation 4CaaSt Project, Deliverable 2.3.1, January 2012.
  • A. Spriestersbach, A. Giessmann, V. Anagnostopoulos, J. Caceres, M. Peñalvo, S. Strauch, T. Binz, D. Toth, D. Fey, J. Niemoeller, F. Lelli, J. L. Vazquez-Poletti, M. Jimenez, S. Carrié, F. Exertier Analysis of the state of the art and Definition of requirements, 4CaaSt Project, Deliverable 1.1.1b, July 2011
  • F. Lelli, D.K. Nguyen, M. Parkin,Y. Taher Blueprinting the Cloud: Scientific and Technical Report, 4CaaSt Project, Deliverable 2.1.1, July 2011
  • F. Lelli, D.K. Nguyen, M. Parkin,Y. Taher, S. Strauch, T. Binz, J. Niemoeller Component Design and Open Specification, 4CaaSt Project, Deliverable 2.2.1, July 2011
  • T. Binz, J. A. Cáceres, S. Carrie, F. Exertier, S. García, M. Jiménez, R. Krebs, N. Kruber, F Lelli, G. Le Jeune, J. López, J. Martínez, B. Moltchanov, J. Niemoeller, S. Ortega, C. Sheridan, A. Spriestersbach, Y. Taher Conceptual Model and Reference Architecture, 4CaaSt Project, Deliverable 1.2.1, July 2011
  • A. Spriestersbach, A. Giessmann, V. Anagnostopoulos, J. Caceres, M. Peñalvo, S. Strauch, T. Binz, D. Toth, D. Fey, J. Niemoeller, F. Lelli, J. L. Vazquez-Poletti, M. Jimenez, S. Carrié, F. Exertier Analysis of the state of the art and Definition of requirements, 4CaaSt Project, Deliverable 1.1.1b, Jennuary 2011
  • G. Reif, T. Groza, S. Scerri, S. Handschuh, F. Lelli, E. Felix, R. Gudjonsdottir, L. Sauermann, A. Johnston, M. Pinzger, Final NEPOMUK Architecture, Nepomuk Project, Deliverable 6.2b, October 2008
  • F. Lelli, NEPOMUK User Guide, Nepomuk Project, Deliverable 6.7a, October 2008
  • G.Maron, F. Lelli, D. Colling, R. Ranon, R. Pugliese, V. Tramutoli, P.Molini, S. Mc Gough, C. Kotsokalis, M. Irving, M. Grammatikou, GridCC: Project Final Report, GridCC Project, Deliverable 8.3 January 2008
  • M. Grammatikou, C. Marinos, V. Pouli, G.Maron, F. Lelli, P. Sphicas, S. Papavassiliou, V. Maglaris. Final Report on Functionality and Performance of GRIDCC system, GridCC Project, Deliverable 6.5 October 2007
  • M. Grammatikou, P. Sphicas, G. Maron, F. Lelli, R. Pugliesse, P. Hobson, F. Davoli, A. Lenis, P. Katsafados, V.Chatzigiannakis Document with performance measures and comparison with no-real time environment. Installation report for the full set of GRIDCC applications, GridCC Project, Deliverable 6.4 September 2007
  • Z. Har'El, S. Pinter, B. Mandler, A. Harpaz, N. Naaman, G. Gershinsky, E. Dekel, F. Lelli, G. Maron, P. Molini Report on the Web Services Compliant Monitoring Middleware Documentation, GridCC Project, Deliverable 2.7 September 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Quality of Service into the IE, GridCC Project, Deliverable 3.6a4 September 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on the VIGS release, GridCC Project, Deliverable 3.6 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. IE component highlight and installation procedure, GridCC Project, Deliverable 3.6.a1 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Instrument Manager Programmer Guide, GridCC Project, Deliverable 3.6.a2 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. SRM Clients, GridCC Project, Deliverable 3.6.a3 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. SRM interface and its implementations (StoRM and Bestman) in the IE, GridCC Project, Deliverable 3.6.a4 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Data Collector, GridCC Project, Deliverable 3.6.a5 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. IRS: Instrument Reservation Service, GridCC Project, Deliverable 3.6.a6 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. IE peer to peer discovery, GridCC Project, Deliverable 3.6.a7 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Updated release of IM, GridCC Project, Deliverable 3.6.a8 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on login Grid service release, GridCC Project, Deliverable 3.7 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Configuring Tomcat to use httpg or https plus VOMS proxy certificates, GridCC Project, Deliverable 3.7.a1 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Configuring Kerberos security for IE, GridCC Project, Deliverable 3.7.a1 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on Resource Service release, GridCC Project, Deliverable 3.8 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Resource Service Manager Tool - User Guide, GridCC Project, Deliverable 3.8.a1 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on Information and Monitor Service release, GridCC Project, Deliverable 3.9 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Log-IMS User Guide, GridCC Project, Deliverable 3.9.a1 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on Knowledge based Service prototype, GridCC Project, Deliverable 3.10 June 2007
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Problem Solver javadoc APIs, GridCC Project, Deliverable 3.10.a1 June 2007
  • S. Moralis, M. Grammatikou, T. Karounos, S. Papavassiliou, V. Maglaris, P. Sphicas, S. Papavassiliou, T. Ferrari, C. A. Kotsokalis, A. S. McGough, T. Kalganova, P. Hobson, R. Pugliese, F. Lelli, D. Colling, G. Maron, A. Lenis. Revised Architecture Description. GridCC Project, Deliverable 1.3 October 2006
  • C. Huang, P. Kyberd, Z. Har'El, S. Pinter, B. Mandler, A. Harpaz, N. Naaman, G. Gershinsky, E. Dekel, F. Lelli, G. Maron. Web Service Compliant Monitoring Middleware Prototype GridCC Project, Deliverable 2.5 October 2006
  • F. Lelli, G. Maron. Report on QoS Implementation GridCC Project, Deliverable 2.4 October 2006
  • T. Kalganova, F. Lelli, R. Taylor, M. Alsaif, P. S. de Beauregard, S. Suppharangsan, S. Surendrakumar, S. Vidot. Report on investigations into knowledge-based systems GridCC Project, Deliverable 3.5 October 2006
  • F. Lelli, G. Maron. AGaTA Run Control AGaTA Project August 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on the VIGS prototype GridCC Project, Deliverable 3.1 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi, R. Pugliese, F. Asnicar, C. Scafuri, M. Prica, L. Del Cano. VIGS WSDL GridCC Project, Deliverable 3.1.a1 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi, R. Pugliese, F. Asnicar, C. Scafuri, M. Prica, L. Del Cano. VIGS Javadoc APIs GridCC Project, Deliverable 3.1.a2 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Instrument Element Installation Guide GridCC Project, Deliverable 3.1.a3 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on login Grid service prototype, GridCC Project, Deliverable 3.2 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on the Resource Service prototype, GridCC Project, Deliverable 3.3 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. User manual for DUCK filler application, GridCC Project, Deliverable 3.3.a1 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Resource Service database scripts, GridCC Project, Deliverable 3.3.a2 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Report on the Information and Monitoring System prototype, GridCC Project, Deliverable 3.4 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Log-IMS Installation Guide, GridCC Project, Deliverable 3.4.a1 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Log-IMS User Guide, GridCC Project, Deliverable 3.4.a2 June 2006
  • E. Frizziero, M. Gulmini, F. Lelli, G. Maron, A. Petrucci, S. Squizzato, S. Traldi. Log-IMS Performance Tests, GridCC Project, Deliverable 3.4.a3 June 2006
  • F. Lelli, P. Hobson, C. Huang, C. Kotsokalis, T. Ferrari, A. Lenis, G. Maron. A survey of existing middleware for the GRIDCC project GridCC Project, Deliverable 2.1 June 2005
  • S. Moralis, M. Grammatikou, T. Karounos, S. Papavassiliou, V. Maglaris, P. Sphicas, S. Papavassiliou, T. Ferrari, C. A. Kotsokalis, A. S. McGough, T. Kalganova, P. Hobson, R. Pugliese, F. Lelli, D. Colling, G. Maron, A. Lenis. The GridCC Architecture GridCC Project, Deliverable 1.2 March 2005
  • C. Kotsokalis, T. Ferrari, A. Lenis, A. Moralis, M. Alsaif, A. Petrucci, F. Lelli, A. Afzal, S. McGough, D McBride, W. Lee, J Martyniak, L. De Marco, A. Senerchia, F. Asnicar. Technological Review, GridCC Project, Deliverable 1.1 December 2004
Other Scientific Talks
  • WP2 Status Report, 4CaaSt Annual Review, Brussels, Belgium, 23th October 2011.
  • WP2 Status Report, 4CaaSt General Assembly, Tilburg, Netherlands, 4th July 2011.
  • WP2 Status Report, 4CaaSt General Assembly, Oxford, United Kingdom, 15th April 2011.
  • On Blueprinting and Lifecycle, SAP Dusseldorf, Dusseldorf, Germany, 17 March 2011.
  • WP2 Status Report, 4CaaSt General Assembly, Athens, Greece, 3rd December 2010.
  • On Predicting Remote Executions for Pervasive Computing, EMPA-Swiss Federal Laboratory for Material Science and Technology, ETCH Zurich, Switzerland, 6 June 2010.
  • A Few Issues in the Development of Service Oriented Architectures, University of Tilburg, Tilburg, the Netherlands, 6 May 2010.
  • Incorporating Scientific Instruments into the Grid, AAA/SWITCH Info-Day, University of Bern, Bern, Switzerland, 13rd January 2010.
  • XtremWebCH and jOpera Integration: Status Report, Haute Ecole ingenierie, Neuchatel, Switzerland, 14th December 2009.
  • Incorporating Scientific Instruments into the Grid, Swiss Grid Day, University of Bern, Bern, Switzerland, 26th November 2009.
  • Technical and nontechnical issues in modern software development, University of Weimar, Weimar, 12nd October 2009.
  • Can Open Source Improve the Quality of Our Code?, 6th Java User Group Meeting, 29 October 2009, Lugano
  • There is a big gap.., still have to find the time to update this section properly..
  • AGaTA Run Control Status Report, 6th AGaTA Week and Workshop on the Physics with the AGaTA Demonstrator at Legnaro, Legnaro, Padova, Italy, 12th November 2007.
  • Grid Enabled Instrumentation WP3 Status Report, 3rd GridCC annual Review, Imperial College, London, United Kingdom, 15th October 2007.
  • High performance messaging middleware for GRIDCC, 3rd GridCC annual Review, Imperial College, London, United Kingdom, 15th October 2007.
  • QoS implementation Status Report, GridCC All Hands Technical Meeting, Imperial College, London, United Kingdom, 4th July 2007.
  • Problem Solver implementation Status Report, GridCC All Hands Technical Meeting, Imperial College, London, United Kingdom, 3th July 2007.
  • Grid And Applications, LNL a Porte Aperte, National Institute of Nuclear Physics of Italy, (INFN), National Laboratory of Legnaro (LNL) Legnaro, Italy 25th June 2007
  • A P2P Approach for Instruments and Grid, 2nd EGEE User Forum, Manchester, United kingdom, 9th May 2007.
  • AGaTA Run Control: Status Report, AGaTA Collaboration Workshop, Institut de Physique Nucleaire, Orsay, Paris, France, 17th February 2007
  • QoS Architecture and implementation, 2nd GridCC annual Review, European Union Administration Buildings, Brussels, Belgium 18th October 2006
  • WP3 Status Report, GridCC Integration Meeting, Institute of Accelerating Systems and Applications, Athens, Greece, 06th September 2006.
  • The Instrument Element as AGaTA Run Control, AGaTA DAQ Workshop Institut de Physique Nucleaire, Orsay, Paris, France, 27th June 2006
  • Quality of Service Support in Web Services GridCC QoS Workshop, Imperial College, London, United Kingdom, 26th June 2006
  • Middleware selection, GridCC Roll on Review 28th April 2006 European Union Administration Buildings, Brussels, Belgium 28th April 2006.
  • WP3 Status Report, GridCC All Hands Technical Meeting, Elettra Sincrotrone Trieste, Trieste, Italy, 27th March 2006
  • The GridCC Project, TriGrid Workshop, National Institute of Nuclear Physics of Italy, (INFN), Catania, Italy 13th March 2006
  • The GridCC Instrument Element AGaTA Workshop Institut de Recherches Subatomiques (IReS) Strasburg France, 22th November 2005
  • RCMS Performance Test, CMS DAQ Weekly 05th November 2005 CERN Geneve Switzerland.
  • WP6: Pilot Application GridCC Annual Review National Institute of Nuclear Physics of Italy, (INFN), National Laboratory of Legnaro (LNL) Legnaro, Italy 26th October 2005
  • Error handling and Asynchronous communications, CMS Week, CERN, Geneve, Switzerland 12th July 2005
  • GridCC instrument driver, AGaTA Workshop Institut de Physique Nucleaire, Orsay, Paris, France, 28th April 2005
  • Run Control prototype status, CMS Sub-Detector Meeting, CERN, Geneve, Switzerland 26th April 2005
  • Error Handling in RCMS CMS Week, CERN, Geneve, Switzerland 16th March 2005.
  • Approaching the Error Format Problem, CMS DAQ Topical, CERN, Geneve, Switzerland 26th January 2005
  • Approaching the Instrument Element Problems Solver Problem Solver Workshop, Electronic and Engeenearing Department, Brunel University, London, United Kingdom. 15th December 2004.
  • IMS System for Logging Event CMS DAQ meetings, CERN, Geneve, Switzerland. 12th February 2004